Commercial Development Company, Inc. (CDC) | CCR
17839
page-template-default,page,page-id-17839,page-child,parent-pageid-17837,ajax_fade,page_not_loaded,,boxed,qode-theme-ver-1.7,wpb-js-composer js-comp-ver-4.11.2.1,vc_responsive
 

CCR

 
 

CCR RULE COMPLIANCE DATA AND INFORMATION

for Brayton Point Power Station

Documentation made available by Brayton Point LLC

 

 

 

2018

 

Notification of Ash Basins A, B and C Closure Progress Report

Date: July 31, 2018

» Download Document

 


 

Alternative Source Demonstration Brayton Point Power Station

Date: April 11, 2018

» Download Document

 


 

2017 Annual Groundwater Monitoring and Corrective Action Report

Date: January 31, 2018

» Download Document

 


 

 

2017

 

2017 06 Brayton Point CCR NOI for Ash Basin B Closure

Date: June 30, 2017

» Download Document

 


 

2017 10 17 Brayton Point CCR Ash Basin A, Ash Basin B, Ash Basin C Statistical Plan Certification

Date: November 7, 2017

» Download Document

 


 

2017 10 17 Brayton Point CCR Monitoring System Certification Letter

Date: November 7, 2017

» Download Document

 


 

2017 Brayton Point CCR Closure Plan Ash Basin A

Date: November 27, 2017

» Download Document

 


 

2017 Brayton Point CCR Closure Plan Ash Basin B

Date: November 27, 2017

» Download Document

 


 

2017 Brayton Point CCR Closure Plan Ash Basin C

Date: November 27, 2017

» Download Document

 


 

2016

 

2016 Brayton Point CCR Fugitive Dust Control Annual Report

Date: December 8, 2016

» Download Document

 


 

Ash Basin A Closure Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin A Inflow Design and Flood Control System Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin A Liner Evaluation

Date: November 10, 2016

» Download Document

 


 

Ash Basin A Safety Factor Assessment

Date: November 10, 2016

» Download Document

 


 

Ash Basin A Structural Stability Assessment 

Date: November 10, 2016

» Download Document

 


 

Ash Basin B Closure Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin B Inflow Design and Flood Control System Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin B Liner Evaluation

Date: November 10, 2016

» Download Document

 


 

Ash Basin B Safety Factor Assessment

Date: November 10, 2016

» Download Document

 


 

Ash Basin B Structural Stability Assessment

Date: November 10, 2016

» Download Document

 


 

Ash Basin C Closure Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin C Inflow Design and Flood Control System Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin C Liner Evaluation

Date: November 10, 2016

» Download Document

 


 

Ash Basin C Structural Stability Assessment

Date: November 10, 2016

» Download Document

 


Brayton Point CCR Notice of Availability

Date: November 14, 2016

» Download Document

 


 

2015

 

Brayton Point Power Station CCR Fugitive Dust Control Plan

Date: November 17, 2015

» Download Document